Bedford Academy, Bedford

Education

Bedford Academy 1

Sector

Education

Value

£12.5m

Status

In progress

Delivery team

Pick Everard

A new modern, flexible learning environment

Bedford Academy

Bedford Academy currently accommodates 1100 students with a capacity of 8FE, is set to expand to 9FE to meet growing demand. The expansion, will increase the intake to 270 pupils per year, with completion required by September 2025. 

The design includes a two-storey L-shaped extension featuring 16 new classrooms and a flexible multi-purpose hall.

The approach

The building will utilise a steel frame and a suspended beam and block floor system, with folding partitions in classrooms to create adaptable learning spaces. This expansion will provide a modern, flexible environment to support the increased student population.

Pick Everard was appointed through Perfect Circle via the SCAPE Consultancy framework by Bedford Borough Council to project manage the scheme. 

The Project Management team has led the project, supported by Quantity Surveying, NEC Supervisor, and Principal Designer (CDM & PD BSA) services, working collaboratively with Bedford Borough Council and the contractor, ASHE Construction.

Bedford Academy2

Construction on site began in late July 2024, and the project initially encountered a significant challenge when ground obstructions/existing undocumented foundations were discovered. These were left behind when the original school was built years ago. Despite this setback, no other major issues have arisen so far, and the project has proceeded smoothly since overcoming this initial hurdle.

Bedford Academy0

The project places a strong emphasis on involvement with the school ensuring that students are actively involved in construction process. A key highlight of this project so far, is the steel signing ceremony with students from each year group participated by signing a steel beam that is incorporated into the new building. This hands-on involvement allows students to leave a lasting mark on their school’s expansion, creating a sense of pride and ownership to the project.

Throughout the project, Pick Everard is working closely with contractor, Ashe, ensuring that the construction process runs smoothly and that the vision of the school is achieved. This partnership is key to delivering the project on time and within budget, while maintaining the highest standards of quality and safety.